Flexibel auf die Anforderungen der Zukunft zu reagieren, das ist die große Stärke des BMW Group Werkes Leipzig. Grundlage dafür bilden die besonders nachhaltigen und flexiblen Produktionsstrukturen der Fabrik.
The sustainable and flexible production structures at the BMW Leipzig Plant are a great advantage, because it facilitates the adaption towards future challenges.
The plant’s basic structure can be easily modified and extended for future challenges. The production buildings are arranged in a circle around the Central Building. The distances are short and there are many options for future extensions or the integration of new production technologies.
The Central Building is the heart of the plant and the centre of communication. The administration and the quality centre are located here and it offers space for associates and visitors alike.
The supply centre is right next to the assembly. Suppliers and partners undertake the pre-assembly of components. These components are delivered to the assembly lines just in sequence.
The assembly is structured like a comb or the fingers of a hand. Specially designed extensions to the buildings facilitate the delivery of material with lorries to all places of assembly. The integration of new assembly steps is also possible by adding a new finger, making the assembly ready for the future.
Open to communication – flexible for the future.
Learn more.
Page Overview: Plant Structure